Skip to product information
1 of 4

ISO 9001:2026 Nonconformance Report Template

ISO 9001:2026 Nonconformance Report Template

$49

A ready-written document you adapt to your business. Instant download.

Something has come out wrong. This report makes sure it stops here, not at the customer.

Used properly, this is what it does for your business:

  • ✓More customers: faulty work stopped before it reaches them, and problems they find handled properly.
  • ✓More profit: less rework, scrap and repeat mistakes once you can see the patterns.
  • ✓Less stress: a clear, quick routine when something goes wrong, instead of a scramble.
  • ✓Look the part: a record of every nonconformity and what you did about it, the evidence an assessor asks to see.

Why not a free NCR template? Many free ones are written for a different industry, locked until you buy a tool to edit them, or built to the old edition. This one is fully editable, written for any business, built to the 2026 edition in plain English by a former company director, and designed to link to your corrective actions and your register. One avoided bad delivery easily covers the cost.

Director-built, not auditor-built
Director-built, not auditor-built
Plain English, no jargon
Plain English, no jargon
Instant download, yours to keep
Instant download, yours to keep

"Plain Standards have continually under-promised and over-delivered. Outstanding service." Paul J, ATM Security

A batch out of tolerance, a job not done to spec, the wrong item in the van. Caught in time, it costs you a little rework. Shipped by mistake, it can cost you the customer. What matters in the next ten minutes is simple: record what was wrong, keep it away from the customer, decide what happens to it, and note who decided.

When I ran production at a balloon factory, our rule was simple: there's no such thing as a mistake, only an occurrence. People reported problems the moment they found them, because nobody was blamed for owning up. In over 30 years running companies at director level, I learned that a business where people speak up catches its problems in-house. This form is that habit, written down.

Who this is for

Any small or medium sized business that makes, builds, delivers or services anything: a machine shop, a fabricator, a construction or fit-out firm, a print shop, a food producer, a logistics business or a service company. Use it for faulty work you find yourself, problems a supplier sends you, and problems a customer finds after delivery.

It is a short, practical record, not an investigation. If you need to dig into why something keeps going wrong, that's the job of a Corrective Action Request, which this form links to.

View full details

This is F-1870-1, a nonconformance report template (NCR template) in Microsoft Word, written in plain English and prepared to the requirements of ISO 9001:2026.

A nonconformance and a nonconformity mean the same thing: something that didn't meet a requirement. ISO 9001 uses the word nonconformity, so the form does too.

It takes one page per problem, in the order you deal with it: the NC number, date and who raised it; what was wrong; how it was found (a check, an internal audit, a customer complaint, normal work, or after delivery); what was done with the faulty work (put right and re-checked, scrapped, accepted by the customer as it is, or something else); who decided the action, and who agreed any concession; whether the cause needs fixing, with the number of the Corrective Action Request raised if it does; and who closed it, and when.

It also has a removable Start here page and two Operator's Takes. It is designed to be used alongside the Control of Nonconforming Outputs Procedure (SOP-1870), the Corrective Action Request (F-1102-1) and the Nonconformance Register (REG-1870). Those come together in The ISO 9001:2026 Certification-Ready System. The form itself is complete and ready to use on its own.

Stop the faulty work, then fix the cause, on separate forms

This form deals with the faulty item in front of you. When the cause needs fixing so it doesn't happen again, you tick yes, raise a Corrective Action Request and write its number here, so the two are linked. The quick record stays quick, and the investigation gets the time it needs. US and UK quality bodies make the same point: repairing or reworking a faulty item is not corrective action; removing the cause is.

Every decision on record

ISO 9001:2026 asks you to keep evidence of what was wrong, what you did, any concession, and who decided the action (clause 8.7.2). The form has a space for each, including “Concession agreed by”, for when a customer accepts something as it is.

Problems found after delivery count too

The 2026 edition makes clear that problems found after delivery, or during or after a service, are covered as well. The form has a tick box for “Found after delivery”, so those get recorded, not quietly fixed and forgotten.

Trends you can actually see

Each completed form goes on the Nonconformance Register, so you can see the same problem coming back before it becomes expensive. Recording every nonconformity, small or large, is what makes the patterns visible.

See the Operator's Take before you buy

Every Plain Standards document contains a boxed note called The Operator's Take: plain advice from someone who ran real businesses first, then trained as a Lead Auditor. Here is part of the one from this form, word for word.

“Make it safe for anyone to raise one of these. The person who owns up to a mistake has done exactly the right thing, because they have caught it before it reached the customer.”

Part of a complete ISO 9001:2026 system

This document works alongside the rest of your system. Documents that pair naturally with it:

Not sure where this ends and corrective action begins? Read the difference between corrective and preventive action.

A note on where this fits

This is one core document, and it is genuinely useful on its own. A complete, certifiable quality management system is more than any single document: it needs the full set, including the quality manual and the system-level documents. If you decide to go all the way, The ISO 9001 Certification-Ready System brings the whole thing together. This is a sensible step, not the finish line.

Why buy from us

  • ✓Built by a company director, not an auditor. Written by someone who ran real businesses before building management systems, so what you get works in the real world, not just on paper.
  • ✓Written in plain English. No jargon, no clause-speak. If you are new to ISO 9001, it will make sense on day one.
  • ✓The Operator's Take, in every document. Look inside any Plain Standards document and you will find a boxed note called The Operator's Take: a short, plain comment from someone who has run businesses, explaining why this document actually matters to yours, and how to get real value from it, not just tick a box for an auditor. No other provider gives you this, because it comes from having sat in the chair.
  • ✓Honest, unaccredited, and clear about it. A genuine route to a working system, with no false claims and nothing hidden.

Frequently asked questions

What is a nonconformance report?

A nonconformance report (NCR) is a short record of something that didn't meet a requirement: a faulty part, a job not to spec, a wrong delivery. It records what was wrong, how it was found, what was done with the faulty work, and who decided. ISO 9001 calls the problem a nonconformity; a nonconformance means the same thing.

Is this an NCR template I can edit in Word?

Yes. It is a Microsoft Word file (.docx) with a blank form ready to fill in for each problem. It also opens in Google Docs and other word processors that read .docx files, though a few layout details may shift outside Word.

What is the difference between a nonconformance report and a corrective action request?

The nonconformance report deals with the faulty item: what was wrong and what you did with it. The corrective action request deals with the cause: why it happened and how you stop it happening again. You raise a corrective action request when the cause needs fixing, and note its number on the report.

Does ISO 9001 require a nonconformance report?

ISO 9001:2026 does not require a form by that name, but clause 8.7 requires you to control nonconforming outputs and keep evidence of the nonconformity, the actions taken, any concessions and who decided. A nonconformance report is the simplest way to keep that evidence.

Is there an Excel version?

No, it is a Word form, because each report is mostly written detail and signatures. To track all your reports in one list, the Nonconformance Register (REG-1870) in The ISO 9001:2026 Certification-Ready System does that job.

Can I use it in construction or manufacturing?

Yes. It works for any work that can fall short of a requirement, from a weld or a machined part to a fit-out, a delivery or a service. Use your own drawings, specifications or contract as the requirement.

Can I use it for a supplier's faulty goods?

Yes. Record the problem, tick how it was found, and note what was done with the goods, such as returning them. If the supplier needs to fix the cause, raise a corrective action request and share it with them.

Written by Mike Armstrong, senior ISO consultant, former company director, and founder of Plain Standards. In over 30 years running companies at director level, Mike built his own management systems to drive profit long before he adopted ISO 9001, so he comes at this from the owner's side, not the auditor's. Plain Standards helps small and medium sized businesses get ISO certified without a consultant.

  • 5 stars: 1 (100%)
  • 4 stars: 0 (0%)
  • 3 stars: 0 (0%)
  • 2 stars: 0 (0%)
  • 1 star: 0 (0%)
O
Oliver Vance

Saved us weeks of documentation time. The templates are clear and easy to follow.